Many facilities are being required to remove phosphorus for the first time and will need to add a process to the flow sheet. A discharge limit of 1.0 mg/L may be achieved most cost-effectively with chemical addition. Enhanced biological treatment may be needed to meet lower limits down to 0.5 mg/L and below. Additionally, biological treatment has other potential benefits.
Regardless of the treatment method, continuous monitoring is essential. Critical parameters include orthophosphate, dissolved oxygen, oxidation-reduction potential (ORP), total suspended solids, and nitrate.